Day two went well, working all day and feeling it in the morning.
It’s actually kind of sad, as it proves I don’t have a very physically demanding life. I don’t think I should be this sore, but I’m not complaining – after two full days of using circular saws, miter saws, nail guns, etc. etc., I didn’t bleed once.
I did, however, make a few bad cuts… I forgot to measure twice.

Home Office Desk/Shelving  Build - Day 2

Here’s the days lumber with the last completed piece from Day 1.

Home Office Desk/Shelving  Build - Day 2
I totally mismeasured this, so it ended up being longer than planned. I must have measured from the wall instead of from the shelf that it would join to make a corner.
This just means it extends all the way to the wall and I’ll have some hard-to-get-at shelf area. I always have stuff I need to keep, but don’t actually need to access, so I’ll put that stuff there.

Home Office Desk/Shelving  Build - Day 2

Home Office Desk/Shelving  Build - Day 2
The room, first piece moved in. I stuck the camera up in a corner to get this photo. It’s a small room (thus the need to make use of as much of the space as I can).

Home Office Desk/Shelving  Build - Day 2
Moving parts in to asseble everything in the room.One of the requirements for the desk was it couldn’t be fastened to the floor and few, if any, wall anchors.

DSCF1039A rare sight! Me in my lone baseball cap. I’ve had this drill for 12 years now. Only had to buy a new battery last year.

DSCF1040

Home Office Desk/Shelving  Build - Day 2
The piece on the right will be moved out (so the sides of the two shelves meet to form a corner), and shelves installed on the bottom half, and the shelves rearranged on the top half.

Home Office Desk/Shelving  Build - Day 2

The center piece was installed to begin connecting the left and right parts. There’s still shelving I need to install above this center desktop, and a number of adjustments.
At the end of the day I’d set my office computer up, and luckily it had a decent connection through our WiFi. I really didn’t want to run ethernet cables through the attic, or really do anything else to get a connection right now.

Day 3 will have to come some other day, it’s raining and sleeting today, and I had to get back to my straight job.

I’m pretty satisfied with the project so far, and for running on instinct and very few carpentry skills, I think I’ve done a fine job. I’ve got a few ideas for finishing the project, and I’ve still got to figure out the mail order station.
.

Related posts:

  1. Home Office Desk/Shelving Build – Day 1
  2. Home Office – Desk/Shelving Build – Day 4 through Fuck
  3. New home, new bookshelves…
  4. Two godless men, one night, only one was taken home with me…
  5. Nerd Project No. 666